Project: wcooper   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:William Cooper   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:29.5
Total Flight Time:
Total Expense:$175687.69
Start/Last Date:Jan 29, 2019 - No Finish Date
Engine:Lycoming YIO-540-D4A5 RT(Y)
Propeller:Hartzell C2YR-1BFP/F8068D
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=wcooper

Home or Last Project Picture

May 27, 2023     Door Mechanisim and Door Handle Preparation       Category: Doors
Sanded and shaped the Door Pin Guide Blocks to nest in the pockets on the door. The Door Handle Gear Racks needed to be cut in half rather than per the Van's instructions. The top Rack Gear also needed to be beveled to allow full extension into the door at the elbow cavity. I used the bench sander to make the bevel. Then the AeroSport Door Handle Door Preparation started by setting the strike plate into position and marking guide lines for the holes to be cut and drilled for the door handles.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.